~~~~~~~~~~~~~~~~~~~~~~~~
Have you
ordered a QBSE Kit?
2010 QBSE UPDATED BUILD VIDEO
The images
below show how the QBS Electric Gondola is built.
Place the left main gear
in the battery plate as shown.
More details for this
Step can be found using the links below
Place the right
side main landing gear, receiver plate, nose gear strut and the main
strut.
Put these parts together
as shown.
More details for this
Step can be found using the links below
Align the main gear in
the bottom notches and rotate the plates so they match.
Then place the
two 1" screws with flat washers as shown.
Then install the four 1
1/4" screws to hold the wire in the slots.
More details for this
Step can be found using the links below
Click HERE for details on how the plates are put together. (4:25 into the
video)
Install the firewall by putting
it in place and sliding it down until the wire on the right fits into the small
slot as shown.
Install the spacer using two 1"
screws with flat washers.
Then add the servo mount using
two 2" screws so the battery plate fit can be checked before the motor is
installed.
Mount the battery plate to the
battery using the provided double sided tape and Velcro straps.
Insert the two 2.5" screws in
the remaining holes of the servo plate. Then check the fit as the upper battery
plate tab is inserted under the screw and flat washer on the side of the servo mount. Adjust the screw
if needed.
Please
note: This screw can not be adjusted after the motor is
installed.
Next you will need to install
the ESC mount. Locate your motor and the parts shown.
You may need to drill
out your mount for the 6/32 screws to pass through.
Place the screws through the
motor mount and through the servo mount as shown.
Then install the ESC mount as
shown.
Here is a look after the ESC
has been installed using the double sided tape and heat shrink
tubing.
Next locate the prop ring
hardware and fly-bar. Install the fly-bar and prop ring as
shown.
Then install the antenna using
the three small screws provided. The receiver is mounted using the provided
double sided tape and Velcro
strap. Mount the switch, nose wheel and prop.
~~~~~~~~~~~~~~~~
Building
Notes
Be sure and put
tape around the receiver to secure the crystal in the receiver.
I have also
added a small piece of 1 3/8" long fuel tubing over the antenna
wire.
Take a look at your
gondola and things should be square.
Check the view looking
from the top down. The prop and fly-bar should be parallel and 90 degrees to the
nose gear strut.
The prop ring should be
adjusted forward or back so the prop is located inside the prop
ring.
(Click images for larger
view)
QBSE Gondolas shown
being test flown with 3 color 82" parachutes.
Test flight videos can
be seen using the following URL:
(82" Parachute not
included in the QBS Electric Kit)
QBS
Electric Kit Pricing
QBSE kit $85.00 plus shipping
QBSE Kit / Parachute
Combo
QBSE kit with 82" Sea Breeze Parachute
(up to 3 colors) $275.00